How many revisions should a freelancer include?

How many revisions should a freelancer include? Get a simple rule, a copy-paste revision clause, ₹ pricing for extra rounds and WhatsApp scripts.

Prakash Mummidisetti · · 9 min read

"Logo achha hai, bas colour thoda aur pop karna chahiye. Aur font bhi ek baar dekh lo na?" That's message nine on the same logo, and you quoted for two rounds. Or did you?

How many revisions should a freelancer include? For most projects, two rounds per deliverable is a sensible starting point. But the number matters less than the rules around it: what counts as one round, who sends the feedback, how fast, and what the next round costs. This guide gives you a way to choose the number, a revision clause you can paste into your quote, ₹ examples for pricing extra rounds, and the WhatsApp messages to send when the limit runs out.

Quick answer: include 1 round for small, tightly briefed work, 2 rounds for most design, writing, video and web work, and 3 rounds when several people sign off or the deliverable sets the direction for everything else (like a logo). Count rounds per deliverable, define a round as one consolidated set of feedback from one named person, set a feedback deadline, and write the price of an extra round into the quote. Never write "unlimited revisions" on a fixed price.

How many revisions should a freelancer include? A simple rule

There's no law in India that sets a number. It's whatever you and the client agree to, and a quote the client accepts is part of that agreement. So pick a number on purpose instead of copying one.

Start at two rounds per deliverable, then adjust:

  • Add one round if more than two people on the client side approve the work (founder, marketing head, the founder's brother), or if the deliverable decides everything after it. Logos, colour palettes and website homepages fall here.
  • Take one round away for a small, well-defined job built on something that already exists: a banner in an approved brand style, a resize set, a short edit from a locked script.
  • Check your price covers it. Estimate how long one round takes, multiply by the rounds included, and make sure that time is inside your quote. If a round of logo changes takes you about 3 hours and you include 3 rounds, about 9 hours of your price is revision time.

Here's how that rule tends to play out by type of work. These are starting points to adjust, not market data:

DeliverableRounds to start withWhat pushes it up or down
Logo / brand identity2–3, after the client picks one directionHow many concepts you show first; how many approvers
Social media post set (e.g. 12 posts)2 per batchWhether the brand style is already approved
Website design2 per batch of screensWhether colours and fonts were signed off first
Built website1 round of fixes after reviewDesign changes at this stage are new scope, not revisions
Video edit2 (rough cut, then fine cut)Whether the script and music were locked
Article or website copy2Whether you write it or the client supplies it

Notice "per deliverable". If your quote says "4 revisions" for a logo plus a website, the client can spend all four on the logo and still expect website changes. Tie the rounds to each item, the way we set up deliverables in how to write a freelance quotation.

What counts as one revision round

This is where most revision limits fail. You wrote "2 rounds". The client sent eleven WhatsApp messages over nine days and calls it round one.

Write all of these into your quote:

  1. One consolidated set of feedback. All changes in one message, one document or one call summary. Not a trickle of voice notes as ideas arrive.
  2. From one named person. If the client's partner and manager both have views, the client collects them and sends one list. Name that person in the quote.
  3. Within a feedback window. For example, 3–5 working days after each draft. Otherwise a ten-day project stays open for two months.
  4. Inside the agreed direction. A revision refines what was approved: wording, spacing, colour, size, timing of a cut. A new concept, a new page or a change to something already approved is new work.

And what does not use up a round:

  • A question about the draft with no change requested
  • Fixing your own mistake: a typo, a broken link, something that doesn't match the approved brief
  • Extra feedback sent before you started on the changes (it joins the current round)

Revision clause for freelancers you can copy

Paste this into the terms of your quote and replace the brackets:

Revisions. Each deliverable listed above includes up to [2] rounds of revisions. One round is a single, consolidated set of written feedback from [client contact name], sent within [5] working days of receiving a draft. Corrections of my own errors do not count as a round. Requests that change the approved direction, add deliverables or change work already approved are new scope and will be quoted separately. Additional rounds are charged at [₹1,500 per round / ₹800 per hour], and start only after you approve the cost in writing.

Some freelancers add: "If I don't receive feedback within [10] working days, the draft will be treated as approved." That's a strong line. It only helps if the client accepted it before work began, so check with a lawyer before you rely on it.

Put the same wording in your contract if you use one. A quote that says 2 rounds and a contract that says "reasonable revisions" gives the client the vaguer one to argue from.

How to price extra revision rounds (₹ examples)

There are two common ways. Both are examples to adapt, not market rates:

  • Per round. Works when rounds are roughly the same size: a logo, a thumbnail, an article, a short Reel. Say you quoted ₹18,000 for a café's logo with 2 rounds, and a round takes you about 3 hours. An extra round at ₹1,500–₹2,000 keeps you paid for that time. The client knows the cost before asking.
  • Hourly. Works when one "small change" can take ten minutes or two days, which is most web development. Quote your rate (for example, ₹800 per hour) and give an estimate before you start: "about 4 hours, so ₹3,200."

If you're GST-registered, an extra round is just another taxable line on your invoice, at the same rate as the main work. Whether you need GST registration depends on your turnover under the CGST Act (CBIC), so check with your CA if you're unsure.

When the extra work is bigger than a round (a new page, 6 more posts), don't stretch the revision clause. Send a proper change order with the price and the new date.

What to say when the client hits the limit

The worst time to mention the limit is after you've quietly done round three. Tell the client where they stand at every draft.

With each draft:

Hi Priya, here's draft 2 of the logo. This is revision round 1 of 2. Please send all changes in one message by Thursday so I can include everything in the next version.

When the last included round starts:

Got your feedback, thanks! Just a heads up: this is round 2, the last one included in the quote. Do check with Rohit sir as well before I start, so we capture everything in one go.

When round three is requested:

Happy to do this. We've used the 2 rounds included in the quote, so an extra round is ₹1,500 as per the terms. Shall I go ahead? I'll start as soon as you confirm here.

A "yes, go ahead" on WhatsApp is a written record. Under section 10A of the Information Technology Act, 2000, a contract isn't unenforceable just because it was formed electronically. Still, save the chat and repeat the amount on your invoice.

If the client pushes back, offer a choice instead of an argument: a paid round, or combining the change with something already planned. Keep the tone friendly. You're reminding them of something they agreed to, not catching them out. For more scripts like this, see how to stop scope creep.

Mistakes that make revision limits useless

  • "Unlimited revisions" or "revisions till satisfaction." On a fixed price, this means unlimited unpaid hours. It only makes sense on hourly or retainer work, where more rounds means more pay.
  • A number with no definition of a round. "2 revisions" invites the client to call every message one tweak inside round one.
  • Pooled rounds across the whole project. Always per deliverable.
  • No feedback deadline. The project never closes, and neither does your final invoice.
  • Not counting out loud. If the client never sees "round 1 of 2", round three feels like a surprise charge.
  • Doing the extra round first, asking later. Get the yes and the price before you open the file.

Doing this without a pile of PDFs

The system above is simple: rounds written per deliverable, the client's approval on record, revisions counted as they happen, and extra work priced before it starts. In ScopeFlow, you set a revision limit on each deliverable in your quote, the client approves it through a private link (no account needed), and the approved version is locked. Revisions used and remaining are tracked as requests come in, and anything outside the scope can become a change order the client approves before you start. It's in beta, and the Free plan covers 2 active projects and 5 clients, so you can start free or see pricing.

FAQ

How many revisions should a freelancer include?

Two rounds per deliverable suits most freelance work. Use one round for small, tightly briefed jobs and three when several people approve the work or the deliverable sets the direction, such as a logo.

What counts as one round of revisions?

One consolidated set of written feedback from one named person, sent within an agreed number of days after a draft. Fixing your own mistakes doesn't count as a round, and a change of direction is new work.

Should I offer unlimited revisions?

Not on a fixed price. Unlimited revisions only work on hourly or retainer billing, where every extra round is paid time.

How much should I charge for extra revisions?

Price a round from the time it takes you: hours for one round multiplied by your hourly rate. Charge per round for similar-sized changes and hourly for unpredictable ones, and get the client's written OK before starting.

Is a WhatsApp approval valid for extra revision charges?

A written yes on WhatsApp is a record of what was agreed, and Indian law recognises contracts formed electronically. Save the chat, repeat the amount on your invoice, and check with a lawyer for anything high-value.

Your next step

  • Pick rounds per deliverable using the rule above
  • Paste the revision clause into your quote template
  • Set your extra-round price (per round or hourly)
  • Add "round X of Y" to every draft message